Project Name: Elgin O'Hare Western Access Tollway

Project Date: 04/23/2019 – 04/24/2019

Location: Bensenville, IL

Partners: Lake County Grading (LCG) Company, Illinois Tollway Authority, Interra Services

Customer Group(s):

  • Public Agencies (Pavement System Owners): FHWA, State DOTs, Tollway Authorities

  • Earthwork/Grading Contractors

Ingios Engineers Involved: Pavana Vennapusa, David White, Lake Carter, Heath Gieselman, Brendan FitzPatrick.

Tech briefs:

Automated Plate Load Test

Pavement Mechanistic-Empirical (ME) Design Verification using APLT Testing

Modulus Verification Mapping Using COMP-Score® RT

Challenge: The Illinois Tollway Authority specifications for compaction quality required the contractor to implement intelligent compaction measurements independently calibrated to pavement design modulus (e.g., modulus of subgrade reaction) values with a minimum R2 >= 0.85. Lake County Grading (LCG) company performed initial calibration testing with two index-value based intelligent compaction systems, using nuclear density gauge and light weight deflectometer. The results did not produce the minimum calibration requirement.

Solution: Ingios® addressed the project challenges being faced by the contractor with a multi-faceted solution of engineering services, training, and technology deployment.

Ingios performed calibration testing with 30 in. diameter static plate load testing to directly measure the modulus of subgrade reaction, k-value, and analyzed results for the two index-based intelligent compaction systems and the Ingios CRT system. Professional Engineering calibration records were produced for each measurement system, per specification requirement, with documentation of the measured versus predicted k-values and the associated statistics. CRT system yielded a R2 of 0.98, while the traditional index-value based intelligent compaction system yielded R2 of 0.55 and 0.81.

Benefits: The Ingios CRT solution exceeded the project specification requirements for calibration. Using mapping solutions that can provide high degree of confidence in the predicted values and are independently calibrated with direct measurements offers a significant advantage with using CRT technology for agency Quality Assurance. CRT map results showed in real-time areas that required additional compaction and differences in areas with and without lime stabilized subgrade.

S Riverfront Dr Test Sections
S Riverfront Dr Test Sections
I-265 Ohio River Bridges Project
I-265 Ohio River Bridges Project
Ground Improvement Verification for New Building
Ground Improvement Verification for New Building
In Situ Modulus Measurement Using Automated Plate Load Testing (APLT)
In Situ Modulus Measurement Using Automated Plate Load Testing (APLT)
Industrial Yard Expansion
Industrial Yard Expansion
Interstate 25 North Express Lanes Project
Interstate 25 North Express Lanes Project
Lessons Learned from Implementing Advanced Compaction Monitoring at CCR Landfills Storage Facilities
Lessons Learned from Implementing Advanced Compaction Monitoring at CCR Landfills Storage Facilities
Illinois Tollway Central Tri-State Corridor (I-294)
Illinois Tollway Central Tri-State Corridor (I-294)
© 2024 Ingios Geotechnics. All rights reserved.